City of Shoreview
Home MenuStreet Projects
The public works department manages several maintenance and reconstruction projects yearly. Find out more about these projects in the city's Five year capital improvement plan (CIP).
We understand that street projects can sometimes cause short-term inconveniences. Our plan is to complete these projects with the least amount of interruptions. We thank you for your patience as we continue to improve your streets, utilities, and trails.
651-266-0300
The city will install two new sections of watermain: (1) from Milton Street to Target Lane and (2) from Woodbridge Street to North Owasso Boulevard. Minor other work will be included, such as valve and hydrant replacements. This project is part of the city's ongoing work to provide an efficient and reliable water system for our residents.
Construction will use trenchless technology to install the pipe, which allows the project to minimize disruption to surface pavement and vegetation along the project.
No assessments will be associated with this project.
The 2025 watermain project is currently in the preliminary design phase. Final locations of the new watermain are still being determined. Construction is anticipated in 2024.
Project will include work in multiple neighborhoods, with 4.5 miles of roadwork and 1.5 miles of trails and sidewalk replacement.
Please note the construction schedule is weather-dependent and subject to change:
October 9th:
Contractor will do preventative maintenance on the newly paved streets called "saw and seal," to saw joints in the pavement and immediately adds a sealant on the top to make them water-tight, preventing pavement damage.
Work planned for the week of October 7th:
- Storm sewer work on Schifsky Road
- Curb and driveway work on Larson Road
- Other minor work
Work planned for the week of September 30th:
- Storm sewer work on Schifsky Road
- Curb and driveway work on Larson Road
- Other minor work
Work planned for the week of September 23rd:
- Finish pavement markings and stripes
- Restoration
Work planned for the week of September 9th:
- Restoration and minor work to complete the project
Work planned for the week of September 2:
- Complete boulevard restorations
- Work on miscellaneous items for completion
Rain caused some delays last week. Thank you for your continued patience.
Work planned for the week of August 26:
- Pave remaining streets
- Pave trails in Shamrock Park and Bucher Park
- Pave Churchill Street driveways
- Boulevard restorations
- Harriet Avenue retaining wall
Work planned for the week of August 19:
- Stormwater improvements at Turtle Lake Road & County Road J
- Spot concrete repairs
- Boulevard restoration
- Complete work on Hodgson gravel road
- Continue work on Harriet Avenue retaining wall
Update August 12, 2024
- Add stabilizer to the gravel on remaining road rehabilitation segments
- Raise utilities to paving level
- Pave trails in Shamrock Park and Bucher Park
- Pave Churchill Street driveways
- Complete work on Hodgson gravel road
- Continue work on Harriet Avenue retaining wall
Update August 2, 2024
Work planned for the week of August 5:
- Street reclamation (grinding up pavement) on remaining streets (Bucher Avenue, Turtle Lake Road, Lametti Lane, Evergreen Lane, Catherine Lane, Carol Lane)
- Pave trails in Shamrock Park and Bucher Park
- Pave Larson Road
- Pave Churchill Street driveways
- Continue work on Harriet Avenue retaining wall
Update July 26, 2024
Approximately half of the rehabilitation streets have been paved.
Work planned for next week:
- Concrete sidewalk and curb repairs
The week of August 5th, the contractor will grind the pavement (reclaim) the remaining streets.
Update July 19, 2024
Work planned for next week:
- Add stabilizer to the gravel on remaining cul-de-sacs and shorter road rehabilitation segments
- Raise utilities to paving level
- Pave rehabilitation streets
- Place new Hodgson Road gravel
- Reconstruct Harriet Avenue retaining wall
- Concrete sidewalk and curb repairs
- Trail work at Shamrock Park and Bucher Park
Update July 2, 2024
Thank you for your patience over the 7 days it takes for the new concrete to harden. Work planned for next week:
- Concrete curb replacement
- Pave trails
- Place topsoil
- Reclaim (grind up the asphalt pavement) on Bucher/Buffalo, Lake Wabasso Court and Mackubin Street
Project schedule:
- July
- Hodgson Road gravel reconstruction
- Larson Road reconstruction
- Trail work at Shamrock Park and Bucher Park
- Street reclamation (grinding up the pavement) in multiple neighborhoods
- August/September
- Gravel preparation
- Street paving
- Lawn restoration
June 20 update:
Next week:
- Continue water valve work in the Bucher/Lametti/Turtle Lake neighborhood
- Spot curb and gutter repairs - various neighborhoods
- Trail paving on Lexington Avenue
- Sidewalk and topsoil installation at Churchill Street and Mackubin Street
June 13 update:
Next week:
- Water valve work in the Bucher/Lametti Turtle Lake neighborhood
- Trail paving on Lexington Avenue
- Sidewalk installation at Churchill Street and Mackubin Street
Project schedule:
- June -
- spot utility work throughout the project
- curb installation
- July
- Hodgson Road gravel reconstruction
- Larson Road reconstruction
- Trail work at Shamrock Park and Bucher Park
- July/August - Street reclamation (grinding up the pavement) in multiple neighborhoods
- August/September - street paving
The Ramsey-Washington Metro Watershed District, in cooperation with the City of Shoreview, will be restoring the wetland located to the west of Cottage Place.
View additional project details.
View additional project details.
Schedule (weather-dependent):
Ramsey County is the lead on this project.
Read about Hodgson/Gramsie Road project
Hodgson Road/Gramsie Road
**Schedule Update - Rice Street closure is anticipated to re-open the week of November 25th**
Work planned for the week of November 18th:
- Installing signs, roadway stripes and other pavement markings
- Installing sod and other restoration items
Work planned for the week of November 4th:
Trails and sidewalk construction
Work planned for the week of October 14th:
- Paving Rice Street
- Grading walks and trails
Work planned for the week of October 7th:
- Grading and gravel installation on Rice Street
- Curb installation
- Storm pipe installation
- Pond excavation
Work planned for the week of September 30th:
- Storm pipe installation
- Grading and gravel installation on Rice Street
Work planned for the week of September 23rd:
- Continue restoration in finished areas
- Begin work on Vadnais Heights utilities on Rice Street
- Complete storm work
Work planned for the week of September 9th:
- Hodgson Road and Gramsie Road open to traffic on Monday, September 9th
- Rice Street from Rustic Place to Demar Avenue will be closed starting Monday, September 9 - Please use posted detours
- Pavement removals on Rice Street
- Tree removals
Work planned for the week of September 3rd:
- Paving asphalt on Hodgson Road
- Painting roadway stripes other pavement markings
- Hodgson Road and Gramsie Road open to traffic.
- Rice Street from Rustic Place to County Road F will be closed starting September 9. Please use posted detours.
Work planned for the week of August 26th:
- Concrete installation
- Raising manholes to final pave height
- Paving the last lift on Hodgson Road and County Road F
- Communication line relocations (by others)
Work planned for the week of August 19th:
- Paving Hodgson Road, Gramsie Road and County Road F
- Grading the sidewalk and trails
- Street lighting and signage installation
- Communication line relocations (by others)
Update August 12, 2024
- Install concrete curb on County Road F, Hodgson Road (south of County Road F) and Roundabout
- Restoration from Dawn Avenue to Floral Court
- Street lighting and signage installation
- Communication line relocations (by others)
Update August 2, 2024
Work planned for the week of August 5th:
- Concrete installation to include work on the Snail Lake Road sidewalk and the new bus shelter location near Gramsie Road
- Paving the asphalt trail from Floral Court to County Road F
- Storm sewer installation: County Road F to the roundabout
- Roundabout gravel base
- Street lighting installation
- Power and communication lice relocates (by others)
Update July 26, 2024
Work planned for next week:
- Installing traffic signal at Snail Lake Road & Hodgson Road
- Watermain install: County Road F to roundabout
- Storm sewer install: County Road F to roundabout
- Roundabout excavation and gravel base
- Power and communication line relocates (by others)
Update July 19, 2024
Work planned for next week:
- Saturday, July 20 - Contractor will shift traffic to the temporary bypass pavement at the Hodgson/Gramsie/Rice intersection. No closure during this phase of construction.
- Monday, July 22 - Begin crushing the large pile of concrete. Anticipate noise during this work.
- Seed pond slopes
- Pour pedestrian ramp concrete for pathways
- Watermain install between County Road F and Gramsie Road
- Storm sewer install south of County Road F and begin work at roundabout
- Power and communication line relocates (by others)
Update July 2, 2024
Work planned for next week:
- Install watermain and storm sewer (County Road F to Gramsie Road)
- Curb and gutter install (Floral Court to County Road F)
- Sod installation (Snail Lake Road to Dawn Avenue)
- Power and communication line relocates (by others)
Update June 20, 2024
Work planned for next week:
- Lighting Pole installation
- Reconnect city-water on County Road F
- Install storm sewer (Hodgson Road and County Road F)
- Pave trail and install concrete (Dawn Court to Floral Court)
- Power and communication line relocates (by others)
- Gas line work (by others)
Update June 13, 2024
The Hodgson/Rice/Gramsie intersection signal will switch to 4-WAY STOP, scheduled Tuesday, June 18, 2024.
Work planned for next week:
- Tree Removals
- Lighting Pole installation
- Install sanitary sewer and water (County Road F and Hodgson Road: Floral Court to Gramsie)
- Install storm sewer (Hodgson Road and County Road F)
- Topsoil behind the curb (Dawn Court to Floral Court)
- Power and communication line relocates (by others)
- Gas line work (by others)
Update June 10, 2024
Work planned for next week:
- Tree Removals
- Lighting Pole installation
- Install sanitary sewer and water (County Road F and Hodgson Road: Floral Court to Gramsie)
- Install storm sewer (Hodgson Road: Demar Avenue)
- Paving asphalt (Dawn Court to Floral Court)
- Sidewalk concrete (Snail Lake to Colleen Avenue)
- Power and communication line relocates (by others)
- Gas line work (by others)
Update May 31, 2024
Work planned for next week:
- Tree Removals
- Install concrete sidewalk and driveways (Snail Lake Road to Dawn Avenue)
- Install curb and gutter (Dawn Avenue to Floral Court)
- Install sanitary sewer and water (County Road F and Hodgson Road: Floral Court to Gramsie Road)
- Power and communication line relocated (by others)
Update May 24, 2024
Work this week:
- Construction moved south: Hodgson Road closed to thru-traffic at Gramsie and County Road F closed at Rice Street. Rice Street will remain open.
- Tree Removals
- Installed curb and gutter (Snail Lake Road to Dawn)
- Installed storm sewer (Dawn Avenue to Floral Court)
- Installed water (Dawn Avenue to Floral Court and County Road F)
- Street pavement removal (Floral Court to Gramsie)
- Power and communication line relocated (by others)
- Tree Removals
- Install sod (Snail Lake Road to Bridge Street)
- Install curb and gutter (Snail Lake Road to Dawn)
- Install storm sewer (Floral Court to Gramsie)
- Install sanitary sewer and water (Floral Court to Gramsie and County Road F)
Update May 17, 2024
Work this week:
- Installed water and sanitary sewer (Dawn Avenue to Floral Court)
- Paved bituminous trail (Snail Lake Road to Bridge Street)
- Power and communication line relocated (by others)
- Install black dirt and sod (Snail Lake Road to Bridge Street)
- Install curb and gutter (Snail Lake Road to Dawn)
- Install storm sewer (Dawn Avenue to Floral Court)
- Tree Removals
- Begin work on southern portion of the project - Hodgson Road closed to thru-traffic at Gramsie and County Road F closed at Rice Street. Rice Street will remain open.
Update May 9, 2024
- Installed water and sanitary sewer (Dawn Avenue to Floral Court)
- Power and communication line relocated (by others)
- Install water and sanitary sewer (Dawn Avenue to Floral Court)
- Install storm sewer and compact gravel (Snail Lake Road to Dawn Avenue)
- Pave bituminous trail (Snail Lake Road to Bridge Street)
- Power and communication line relocates (by others)
Update May 3, 2024
Work this week:
- Installed sanitary and storm sewer
- Grading near Snail Lake Road
- Temporary water connections
- Installed concrete (Snail Lake Road to Bridge Street)
- Power and communication line relocated (by others)
Work planned for next week:
- Install water and sanitary sewer (Dawn Avenue to Floral Court)
- Pave bituminous driveways and trail (Snail Lake Road to Bridge Street)
- Install concrete (Snail Lake Road to Dawn Avenue)
- Power and communication line relocates (by others)
Update April 29, 2024
Work last week:
- Installation of the underground storm water structure at the Hodgson/Rice intersection
- Install water and storm sewer
- Snail Lake Road to Dawn Avenue - Water installation completed, properties back on regular water
- Power and communication line relocates (by others)
Work planned for this week:
- Install water and storm sewer
- Grading near Snail Lake Road
- Temporary water connections
- Install concrete sidewalk (Snail Lake Road to Bridge Street)
- Power and communication line relocates (by others)
Update April 19, 2024
Work this week:
- Tree removals, stump grinding
- Installing water, sanitary and storm sewer
- Reclaim the pavement south of Dawn Avenue
- Truck away the large stockpile
- Additional temporary water connections for properties from Dawn Avenue to Floral Court
- Power and communication line relocates (by others)
Work planned for next week:
- Installation of the underground storm water structure at the Hodgson/Rice intersection
- Install water and storm sewer
- Test new watermain, begin water service installation (Snail Lake Road to Dawn Avenue)
- Power and communication line relocates (by others)
Update April 12, 2024
Update April 12, 2024
Work this week:
- Installation of the underground storm water structure at the Hodgson/Rice intersection
- Tree removals
- Removed the pavement off the roadway
- Installed water, sanitary and storm sewer
- Power and communication line relocated (by others)
- Installation of the underground storm water structure at the Hodgson/Rice intersection
- Tree removals, stump grinding
- Install water, sanitary and storm sewer
- Grading and prepping the area behind the curb and gutter between Bridge St and Snail Lake Rd for the installation of trail and sidewalk
- Additional temporary water for properties from Dawn Avenue to Floral Court
- Power and communication line relocates (by others)
Update April 5, 2024
- Continued installation of the underground storm water structure at the Hodgson/Rice intersection
- Continued to remove trees
- Removed the pavement off the roadway
- Completed installation of the temporary water system
- Replacement of water valves at Snail Lake Rd and Colleen Ave intersections
- Start replacement of underground water and sanitary sewer starting at Snail Lake Rd and moving south
- Continue installation of the underground storm water structure at the Hodgson/Rice intersection
- Continue to remove trees
- As time allows, grading and prepping the area behind the curb and gutter between Bridge St and Snail Lake Rd for the installation of trail and sidewalk
Update March 15, 2024
Work completed this week:
- Started installation of the underground stormwater treatment structure located at the Hodgson Road/Rice Street intersection
- Xcel electric started to move power poles
- Marked trees and pavement that will be removed
- Started installation of temporary water piping
Work planned for next week:
- Close Hodgson Road from Snail Lake Road to
- Dawn Avenue and only allow local traffic. Includes the Snail Lake Road intersection
- Set up Hodgson Road detour
- Start tree removal
- Remove pavement between Snail Lake Road and Dawn Avenue
- Continue installation of temporary water piping
Please see links below for information on other projects that may affect Shoreview residents and businesses: